Faster

30% overall reduction in build cycle
Days, not weeks, to “dry-in” a home
Pre-fabricated floors, walls and roof panels are built in the factory while excavation and foundation are being prepared on-site. This parallel building process will significantly reduce time required to finish the home to be ready for sale. This time savings and elimination of sub-contractor management is a big benefit for developers and customers alike.
Better

Our advanced manufacturing process, minimizes weather exposure and increases quality. The panels are built square, ship square and are installed square. This allows the trades to come in after we have “dried-in” the home and do their jobs, without having to spend costly hours getting things “square” or repairing weather damage.
Safer

Standardized equipment use and safety protocols.
Reduces risk of weather related accidents.
A Crane or similar equipment is utilized on-site to do the “heavy lifting” placing the panels onto the foundation.
Trip hazards, uneven terrain and slippery conditions can create safety risks for on-site builders. These hazards are significantly minimized or eliminated inside the factory.